Wednesday, October 19, 2011

MINUTES OF RJCM MEETING HELD IN THE CONFERENCE HALL OF CIRCLE OFFICE, BHUBANESWAR ON 11.10.2011

Dear Comrades,
MINUTES OF RJCM MEETING
HELD IN THE CONFERENCE HALL OF CIRCLE OFFICE,
BHUBANESWAR ON 11.10.2011

P r e s e n t
Official Side
        S/Shri & Smt.
Staff Side
           S/Shri
1.
Devika Kumar, Chief PMG,
Orissa-cum-Chairperson, RJCM.

1.
R.N.Dhal, Leader RJCM(Staff side)
-cum-SA(BCR), o/o the SSRM ‘N’ Division, Cuttack.
2.
P.K.Bisoi, PMG,
Sambalpur Region, Sambalpur
-cum-Member RJCM.

2.
S.S.Samant, Secretary, RJCM
(Staff side)-cum-PACO(BE).
3.
S.P.Rajalingam,  PMG,
Berhampur Region, Berhampur
-cum-Member RJCM.

3.
R.C.Mishra, Member RJCM
(Staff side)-cum-PRI(P), Bhubaneswar GPO
4.
Suvendu Swain, DPS(HQ), Bhubaneswar-cum-Member RJCM.

4.
 Debabrata Mohanty, Member RJCM –cum-Overseer(Cash), Jajpur HO
5.
L. Pradhan, DPS(BD), Bhubaneswar.
5.
P.N. Mohapatra, Member RJCM (Staff Side) cum SA, RMS ‘BG’ Division, Berhampur

6.
Sukhbir,  DA(P)
-cum-Member RJCM.
6.
B.C. Parida, Member RJCM (Staff Side) cum-SPM, Tirtol SO, Dist. Jagatsinghpur
7.
B.B. Mohanty, A.D.(Welfare),
C.O., Bhubaneswar-cum-Secretary, RJCM.



8
A.S.S.S.V.Rao
A.D (Bldg), CO, Bhubaneswar



                At the outset of the meeting, Chairperson of the RJCM delivered welcome address to all the members present in the meeting.

New Items
1-10/2011             Immediate restoration of status-quo of Puri, Koraput Postal Divisions and RMS ‘N’ Division, Cuttack to Class-I Division and posting of Officers accordingly. The order for down gradation issued by C.O. from SSPO cadre to SPOs cadre and SSRM to SRM cadre is without any logic and an arbitrary order which violated to Directorate order No.2-2/93-PE-I dated 07.9.1993 and para-2(II) of  Dte.No.12-6/2003 dtd. 28.11.2003. The HOCs have no authority to down grade the Group A post to Group B cadre which retains with the Postal Directorate as a permanent measure as per order dated 07.9.1993.
Reply:                    The post of SSPOs Koraput & Puri Division have already been restored and officers have been posted on adhoc basis.  The case of  RMS ‘N’ Division will also be restored when eligible/suitable officers will be available.
Action: AD(Staff)
2-10/2011             Immediate holding of  DPC for LSG cadre in Accounts Line preparing a separate list for PO & RMS Accountants to post them in AHRO(Accounts)/APM(Accounts) cadre to fill up the vacant posts. In this connection the Dte. Order No.06/12/2010-SPB-II dtd.07.3.2011 may kindly be referred to keeping in view the orders in connection with Amendment to recruitment rules 2006 for filling up of the posts of LSG/HSG-II in Post Offices and RMS Offices issued vide Dte./ No.137-4/2006-SPB-II dtd.30.5.2006.
Reply:                    Records have been called for from the units and DPC will be done soon. Action: AD(Staff)
3-10/2011             To stop recovery orders issued by the Sr. A.O., O/o the DA(P), Cuttack-4 in connection with the amount paid to the MTS Group-C (erstwhile Group-D) in connection with pay fixation at the time of financial upgradation under TBOP/BCR scheme which is arbitrary and unlawful in RMS wing done by the DDOs of N-Dvn and K Dvn without any show cause notice to the officials concerned. The individual officials have represented to the Divisional Heads for the purpose. A permanent solution is demanded to end the hue and cry created by Sr.A.O., O/o DA(P) office from time to time. (In this connection the Circle union letter No.RIV/WL/Pay Recovery/N-Dn dtd.27.4.2011 may kindly be referred.)
Reply:                    As per rule 84 to 86 of FHB Vol.I, recoveries order by Audit/Account Officer have to be attended to without delay by DDO. No show-cause notice or prior information to the official concerned,  is necessary. However, SRM ‘N’ Division, Cuttack has been addressed vide C.O letter No.ST/25-5(5)/2010/MACP/RMS N  dated 23.6.2011 not to recover the alleged excess paid amount from MTS staff. Report from the SRM has been called for examining the matter further.
                                The DA(P) will examine the case afresh within two weeks in the light of  rulings and will come up with clarification/ report as to what is to be done in the matter.  Action: DA(P) &AD(Staff)
4-10/2011:           Request to attach the NSPC hubs at Bhubaneswar and Cuttack with RMS ‘N’  Division, for better interest for RMS officials attached with NSPC Bhubaneswar and to be attached with NSPC Cuttack as the work relates to RMS wing SAs so far mail efficient is concerned.
Reply:                    Presently both NSH Bhubaneswar and SSH Cuttack are working in PO premises of concerned HOs. For proper supervision and continuous monitoring it is decided to maintain status-quo.  (Item closed)
5-10/2011             Puri, which is regarded as one of four Dhams of the country and famous for Lord Jagannath Temple and for beautiful sea shore, attracts thousands of pilgrims from the country & aboard to visit every day. The number of pilgrims from inside the country and aboard exceeds to lakhs in festive occasions. A large number of Central Govt. offices like Postal, Telecom, Income Tax and other Central Govt. Organizations are situated in Puri with hundreds of employees. The employees of Postal Department, other Central Govt. employees and also State Govt. employees through the state specifically desire to organise the marriage ceremonies, thread ceremonies and other functions in Puri due to its holistic importance. So, on the above back ground, we appeal for submission of a proposal for construction of a Kalyan Mandap / Community Hall in vacant, unutilised plot registered in the name of the Department, lying adjacent to Inspection Quarter at Netaji Subash Bose Road, Puri. This is also best way to create permanent source of earning for the Department and will help to avoid incidental encroachment possibilities of the land in question. Similarly, we appeal for raising of one proposal for construction of an indoor Stadium (A proposal lying pending since long) in the vacant plot situated near Puri HO, registered in the name of the Department. The back ground behind such proposal is that Puri hosts National level competitions always both of department of Posts and other Central Govt. organisations. Further, it has been reported that the above valuable lands of crores are threatened encroachment from different sides and the above construction proposals are the best way to save the lands from encroachment, also towards the gain of the Department & for staff welfare measures as well.
Reply:                    The proposal was considered and discussed and could not be acceded to as no fund is available for such activity.   (Item closed)
6-10/2011             This is regarding gross irregularities in Circle PA gradation list and awarding LSG promotions basing on that as a result which juniors were given LSG promotions ignoring the seniors. In this connection this union letter No.UN/AIPEU,Gr.C/05-11 dated 04.5.2011, dated 09.5.2011,dated 30.5.2011 and letter No.UN/AIPEU, Gr.C/06-11 dated 02.6.2011 may kindly be referred to through which all the irregularities were communicated. We want following modifications immediately for implementation of Directorate guidelines and also to give justice to senior officials, deserving for promotions to LSG.
                                1-Immediate orders for cancellation of LSG memo of the junior officials in Postmen cadre have been taken into consideration. The senior officials to them should be declared as LSG. 
                                2-The erroneous posting of DOC in gradation list should be corrected allowing senior for promotions to LSG.
                                3-The posting of general line officials against APM Accounts posts should be cancelled immediately  and the senior officials having accountant qualifications should be declared as LSG for posting against APM Accounts posts as DTE guidelines vide letter No.6-12/2010-SPB.II dated 07.3.2011.
                                4-As no DPC was conducted in year 2008,2009,2010, year wise LSG promotions should be declared as per instructions vide Dte letter No.4-17/2008-SPB.II dated 08.2.2011.
                                5-Erroneous posting showing the DOE & DOC as same date in gradation list should be corrected ascertaining from the divisions.
                                6-The representations received from the officials against LSG declarations should be disposed off immediately with proper actions on their claims.
                                7-The subsequently modified Circle PA gradation list corrected up to 01.7.2009, basing on which LSG promotions are declared was not circulated to staffs which needs to be circulated immediately.
Reply:                    The matter is being examined to take care of the shortcomings.  Action: AD(Staff)
7-10/2011             62 number of LGO promoted PAs have not been given with preliminary in-house training/induction training and no appointment orders have issued to them for joining in vacant posts. The Direct recruited PAs, whose examination was conducted after the LGO examination have already joined in the posts after receipt of PVRs, local training and this is a sheer discrimination to ignore the cases of LGO promotees for absorption against the posts and will definitely disturb their seniority and other benefits. Moreover, no PVR is required in their cases and they can be posted against vacant posts just after preliminary local trainings as followed in case of Direct Recruited PAs. We have been informed that the LGO promotees in other circles have been given with appointment orders and place of postings after due local preliminary trainings. Hence, it is urged upon for immediate action for absorption of all LGO promoted PAs against the posts after due local trainings.
Reply:                    Induction training for LGOs at PTC Vadodara will start from 31.10.2011. Suitable instruction has been issued to all concerned to depute the candidates for training. Instruction has been issued to Divisional units on 29.09.2011 to issue promotion and posting orders after imparting in-house training for a week. (Item closed)
8-10/2011             This is regarding non supply of forms/ items from RFD located at Postal Printing Press, Bhubaneswar to Postal Stores Depot, Bhubaneswar as per the decision of our Circle head causing total disruption in supply of forms/items to Post offices & RMS offices through out the Circle. RFD is a godown to receive the forms /items printed in the Printing Press and to transmit the same to all the Postal Stores Depot under its jurisdiction, including PSD, Bhubaneswar. Where as all the Postal Stores Depots within its jurisdiction are lifting all type of forms/items by contractual private carriages, order has been given by our Circle authorities for supply of all forms/items to every Post Office & RMS office of the circle by closing of bags directly from the RFD, Bhubaneswar end. It is submitted that RFD is not the platform for closing of bags directly to the offices containing loose forms/items, rather it is a godown for keeping up forms items, printed by printing press and to make the supplies in bulk to the Postal Stores Depots. The Postal Stores Depots are the established offices with large halls, numerous heighted racks for arrangement of forms/items in systematic manner, keeping the record of stock up to date. The present order by the Circle office for closing of bags directly from the RFD, Bhubaneswar has totally disturbed smooth functioning of PSD Bhubaneswar, continued since its establishment with certain guidelines fixed by the Directorate for functioning of PSDs. This present order also hampered supply of forms/items to the indented offices through out the circle, as PSD Bhubaneswar is at present the only source of supply because PSD Sambalpur has been kept in skeleton form. In addition to that RFD has no working environment and causing hardship to the staff to render their services efficiently as a result of which the supply work is severely affected and there is total hue & cry at the end offices on non-receipt of forms/items. To get rid of the arresting situation, it is requested to kindly withdraw the present order and to continue the supply works to the offices centrally from PSD Bhubaneswar, restoring the system of bulk procurement of forms/items from RFD, as done in the past.
Reply:                    The matter is being  examined. Action: AD(MM)
9-10/2011             EPP-VPPs are being received in all computerised offices while those offices are not designated offices for the purpose. Such VPPs of more than 5000/- value are unable to be received ON LINE and the values when delivered are unable to be remitted ON LINE. Action be taken to declare all offices as designated offices/make provision in the software. 
Reply:                    This will be taken up with the Directorate  with copy to the RJCM (Staff Side).  Action : AD (TOAD (FS)
10-10/2011           Non-functioning of Circle Office Lift for a prolong period.

                                Brief: The lift of this building has become non-functional since long. No effective measures have been taken to make it functional inspite of my repeated discussions with DPS(Hqrs) and CPMG and also joint memorandum by the staff unions/Associations of the building. Madam, it is also a fact that nowhere in the country a multi-storied building is devoid of a lift facility, which is seen and experienced here only. The hardship faced by staff members consisting of ladies, disabled, sick and aged is unimaginable. The paid is quite predictable if a person climbs more than hundreds of steps and get down the same number of steps to reach the ground floor in one walk. Our staff moves more than twice or thrice a day for attending the official business to different sections. Staff murmuring and resentment are mounting day by day which may lead to severe staff discontentment in near future. Action may be taken for immediate settlement of the burning issue.
Reply:                    The Directorate has been addressed for permission for installation of a new Passenger Lift. Condemnation Committee meeting will be conducted  shortly. Action: AD(Bldg)
11-10/2011           Filling up of Essential Technical Posts in Postal Dispensaries: Brief: A large number of Technical Posts are lying vacant since long resulting the beneficiaries are facing difficulties in their day to day Medical facilities. For example the case of Bhubaneswar, all the Technical staff excluding the Medical Officers and one Pharmacist were retired causing the dispensary paralysed. Immediate action may be taken to fill up the vacant posts on daily wage basis as done in other Circles.
Reply:                    The matter has been referred to Directorate for permission to fill up vacant paramedical posts. There is a proposal for merger of Postal Dispensary, Bhubaneswar with CGHS Hospital. In that case filling up the vacant posts by our Department may not arise. However, linking the Dispensary with the Pathological Lab will be examined to enable the beneficiaries to have pathological tests till  the Dispensary is merged with CGHS Hospital. Action: AD (WL)
12-10/2011           Provision of security and parking space for four/Two wheelers in Circle office premises. Brief: Vehicles ( Four/Two) wheeler are increasing day by day. Simultaneously report of theft also growing in the C. O. premises. Hence the parking space as well as garage facility with security system may be provided by the administration like other organizations of Bhubaneswar.
Reply :                   Architect, O/o the S.E.(Civil), Patna has  visited the spot. His report is awaited. The matter will be pursued with him.   Action: AD(Bldg)
13-10/2011:         Drinking water facilities to the staff residing at postal colony Bidanashi, Cuttack & water facilities to the staff residing at staff quarter Sahadev Khunta, Balasore.
                                Brief :These two problems were discussed earlier in all forum starting from divisional level to four monthly meeting. There were so many assurance, replay and all the authorities were agreed that it is vital issue, drinking water and water it is coming under minimum amenity. At the same time we also express our staff difficulties, how they are managing the day without drinking water & water at Cuttack & Balasore respectively. Once again our earnest request to you to take necessary steps for settlement of the issue as early as possible.
Reply:                    The matter has been taken up with the E.E.(Civil), Postal Civil Division, Cuttack Action: AD(Bldg)
14-10/2011:         Uniform should be supplied to the uniformed staff of Odisha Circle.

                                Brief: Actually new cloth i.e. Navy blue and sky blue cloth started from Oct. 2004. The same  supplied to the staff in some division four pair and some where six pair. So from 2004 to 2007 block is four pair and another two pair from 2007 to 2009. So now it is due for 2008 and 2009. In the mean while colour of the uniform clothes has been changed to Khaki. We have taken the issue in all forum and all in vain. So earnest request to you to supply all the staff of Odisha immediately.
Reply:                    Tender  for the procurement of 6520 metres polyester cotton blended khaki shirting cloth and 5160 metre polyester cotton khaki suiting cloth was processed. The TEC Members from staff side  have some reservations about the quality of sample items produced by the tenderers but  have no specific comments to offer regarding the quality with reference to the specifications given in the NIT. The matter is being examined further.   Action: AD(MM)
15-10/2011:         Repairing of Generator of printing press. Brief: The generator of printing press is out of order since long due to frequent power cur at Mancheswar area. So the total work of the printing press is hampered. Without power, the machine of the printing press can not function. All request of the staff side of printing press is not materializing the issue. So earnest request to you immediate repair of the generator of the printing press by which the required forms can be supplied to the offices in the Odisha Circle and all over India as well.
Reply:                    Condemnation of the old Genset and supply of new genset is being examined.  Action: AD(Bldg)
Old Items
6-2/11                    Misinterpretation of DG (Posts) order No.3-20/2008-PCC (Pt), dated 06.09.2010 in connection with ‘Conferment of Financial upgradation under TBOP/BCR/ACP-1/ACP-2 to the erstwhile Gr-D now classified as MTS Gr-C during the period from 01.01.2006 to 31.08.2008” by the Sr. AO (Pension), O/o the DA (Postal), Cuttack-4 vide his letter no. Pen.1/Gen/6th CPC/Corr/R-11392 dated 24.12.2010 advising HRO, N Division, Cuttack that the benefit of Grade Pay of Rs.1900/- can not be advanced to the officials who got TBOP prior to 01.01.2006 as their  pre-revised  pay  scale of Rs.2650-4000/- has  been replaced with GP 1800/- in PB-I. However, for such employees, the promotions/up-gradations earned up to the GP of Rs.1800/- are to be ignored for the purpose of MACP as per DOP & Trg OM No. 35034/3/2008-Estt (D), dated 16.11.2009, which is meant for the staff covered under ACP scheme which was introduced in Aug 1999, but not for the officials covered under [TBOP/BCR scheme to get MACP only.
                                Brief : The Sr. AO (Pen) has not only advised to HRO N Division, Cuttack but also to the DDO, PSD, BBSR for which all are confused. The arrears have not been paid to the officials who got TBOP prior to 01.01.2006 and retired/died thereafter, but the officials who got TBOP prior to 01.01.06 but are in the service have been given arrears by HRO N Division, Cuttack which violates to Directorate order dated 06.09.2010 and DG (P) no. 23-3/2008-UPE dated 09.12.09 which is only a clarification as to who will be eligible for MACP covered under ACP Scheme of Aug 1999.]
Reply                     The position has been clarified under Directorate letter No. 1-20/2008-PCC(Pt) dated 18.7.2011 which has been circulated to all units for compliance vide CO No. Est/1-104/Rlg dated 21/25.7.2011. The  DA(P) will examine the matter within two weeks.                                Action : DA(P)/AD (ST)
3-8/10                    CCS (RSA) Rules-1993- Re-verification of membership for recognition of Service Association – Procedure regarding misinterpretation of Para-2(ii) of Directorate order no. 13-01/2010-SR, dated 18.02.2010 by the SSRM N Division, Cuttack and arbitrary disallowed new members for 5 years who have in writing and chosen for a particular union to continue within the time frame prescribed by the Directorate. Request to allow the members to continue in particular unions and advise the CO/SSRM  to follow the rules in a true spirit. The matter was taken up with CO since 18.05.2010 without any reply.
Reply                     The case was examined. No interference of CO in the action of the SRM is necessary.  (Item closed)
8-9/2009               Provision of supply of water to over head tank of quarter in P&T colony, Unit-IV, Bhubaneswar. The item is kept pending since 2005 vide 11-1/2005 in Four Monthly Meeting. Reply was given that an estimate amounting to Rs.57,73,000/- for construction of a new RCC overhead tank deep tube well and water supply grid was received  from CGMT on 24.07.2003 with a request to bear 50% of the cost from Postal side. But no action has yet been taken so far to initiate the project which is kept in file with safe custody. The residences are clamouring for a drop of water since years together and public resentment is growing day by day.
Reply                     The matter has been taken up with Civil Wing. The Superintending Engineer (Civil),  Postal Civil Circle, Patna has been requested to cause necessary action.  Action: AD(Bldg)
                                The date of next RJCM meeting is tentatively fixed as 10th April, 2012. Agenda for the next meeting may kindly be submitted in time. 
( B.B. Mohanty)  Asst. Director (Welfare)  For CPMG, Orissa Circle Bhubaneswar-751 001 
No. WL/RJCM/2011     Dated at Bhubaneswar the 14th  October 2011


Related Posts Plugin for WordPress, Blogger...
Related Posts Plugin for WordPress, Blogger...
Related Posts Plugin for WordPress, Blogger...